Wyoming


Secretary of the Interior Ken Salazar announced the Department of the Interior’s projects under the American Recovery and Reinvestment Act of 2009 for Wyoming. Across its Bureaus, the Department will invest in Wyoming as part of the recovery plan signed by the President to jumpstart our economy, create or save millions of jobs, and put a down payment on addressing long-neglected challenges so our country can thrive in the 21st Century.

Funding Overview

Wyoming: $64,443,926

Bureau of Land Management: $22,805,000    BLM Logo

  • Construction: $1,550,000
  • Deferred Maintenance: $723,000
  • Habitat Restoration: $2,831,000
  • Remediation of Abandoned Mines: $1,250,000
  • Renewable Energy - Facilitating Authorizations and Permits: $4,655,000
  • Roads and Bridges Maintenance: $10,196,000
  • Trails Maintenance and Construction: $1,600,000

Bureau of Reclamation: $4,167,086    BOR Logo

  • Environmental/Ecosystem Restoration: $457,086
  • Water Infrastructure Reliability and Safety: $3,710,000

CUPCA: $270,000    BOR Logo

  • : $270,000

Indian Affairs: $2,320,840    BIA Logo

  • Operation and Maintenance Repairs for Tribal Spt Operations Detention Center and Employee Housing: $360,050
  • Road Maintenance Project: $1,960,790

National Park Service: $26,611,000    NPS Logo

  • Devils Tower: $69,000
  • Fort Laramie: $121,000
  • Fossil Butte: $73,000
  • Grand Teton: $15,240,000
  • John D. Rockefeller, Jr. Memorial Parkway: $83,000
  • Yellowstone: $11,025,000

U.S. Fish and Wildlife Service: $7,877,000    FWS Logo

  • Cokeville Meadows NWR: $40,000
  • National Elk Refuge: $4,641,000
  • Saratoga NFH: $800,000
  • Seedskadee NWR: $2,396,000

U.S. Geological Survey: $393,000    USGS Logo

Projects in Wyoming

Sort by:

Abandonment of Discontinued Ground Water Well 1
  • Project Number: N/A
  • Bureau: U.S. Geological Survey
  • Unit: N/A
  • State: WY
  • Congressional District: 1
  • Type of Project: Deferred Maintenance - Discontinued Streamgages, Cableways, Wells
Barrell Springs Road Gravel
  • Project Number: LDRBC0130000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Roads and Bridges Maintenance
Baseline data collection for 18 new Travel Management Plans in eight field offices
  • Project Number: LDTDF0780000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Trails Maintenance and Construction
BMPs-Renewable Energy Dvlpmt-Paleo Overviews for Wind
  • Project Number: LXUAA0400000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Renewable Energy - Facilitating Authorizations and Permits
Bridger Pass Road Gravel
  • Project Number: LDRBC0140000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Roads and Bridges Maintenance
Camouflage Testing - Visual Resource Mgmt
  • Project Number: LXUAA0430000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Renewable Energy - Facilitating Authorizations and Permits
Castle Gardens Recreation Site replace and relocate Comfort Station
  • Project Number: LDDFR1300000
  • Bureau: Bureau of Land Management
  • Unit: Llwyr00000 - Wind River/Bighorn Basin District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Deferred Maintenance
CDST Site Maintenance/Safety Structurs/Water source enhancement and development
  • Project Number: LDTDF0770000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Trails Maintenance and Construction
Construct irrigation systems and plant uplands to grasslands. Current winter feeding places elk at risk.
  • Project Number: R6MB
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: National Elk Refuge
  • State: WY
  • Type of Project: Habitat Restoration
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Construction of diversion dam and intake structure to divert water into 45-acre wetlands.
  • Project Number: ARRA9
  • TAFS: Central Utah Project Completion 14-0786
  • Bureau: CUPCA
  • Unit: CUPCA 314(c) Wyoming Project
  • State: WY
  • Congressional District: 1
  • Type of Project: Construction
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/31/10
Cultural Impact Mitigation-Wind
  • Project Number: LXUAA0380000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Renewable Energy - Facilitating Authorizations and Permits
Demolish and Replace Madison Wastewater Facility
  • Project Number: 19892
  • TAFS: (14-1041 2009 2010) Construction and Major Maintenance - Recovery Act
  • Bureau: National Park Service
  • Unit: Yellowstone
  • State: WY
  • Type of Project: Construction
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Demolish and Replace Roof of Wastewater Management Lift Station
  • Project Number: 129769
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Yellowstone
  • State: WY
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Demolish and Replace Unsafe Colter Bay Maintenance Shop Phase II
  • Project Number: 150272
  • TAFS: (14-1041 2009 2010) Construction and Major Maintenance - Recovery Act
  • Bureau: National Park Service
  • Unit: Grand Teton
  • State: WY
  • Type of Project: Construction
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Demolish Structure and Stabilize Eroding Slope at Flagg Ranch
  • Project Number: 153744
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: John D. Rockefeller, Jr. Memorial Parkway
  • State: WY
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Demolish Substandard Trailers and Replace With 8-Plex, Mammoth
  • Project Number: 99269
  • TAFS: (14-1041 2009 2010) Construction and Major Maintenance - Recovery Act
  • Bureau: National Park Service
  • Unit: Yellowstone
  • State: WY
  • Type of Project: Construction
  • Project Status: Additional project that will be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Farson/Eden Pipeline Project
  • Project Number: 25.102
  • TAFS: 14-0681
  • Bureau: Bureau of Reclamation
  • Unit: Eden Valley Irrigation Company
  • State: WY
  • Congressional District: 1
  • Type of Project: Environmental/Ecosystem Restoration
Gravel High Usage Roads
  • Project Number: LDRBC0190000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Roads and Bridges Maintenance
Green River Basin Sage Grouse habitat Assessments
  • Project Number: LXUAA0410000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Renewable Energy - Facilitating Authorizations and Permits
HR Sage Grouse Habitat Improvements - PHASE I
  • Project Number: LXHAB0990000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Habitat Restoration
HR WLCI Enhance Riparian Habitat - PHASE I
  • Project Number: LXHAB0980000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Habitat Restoration
HRB Casper and Buffalo Area Biomass Utilization
  • Project Number: LXHAB1460000
  • Bureau: Bureau of Land Management
  • Unit: Llwyp00000 - Wyoming High Plains District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Habitat Restoration
Hudson Atlantic Road Gravel
  • Project Number: LDRBC0210000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Roads and Bridges Maintenance
Implementation of 8 completed Travel Management Plans in 4 field offices
  • Project Number: LDTDF0750000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Trails Maintenance and Construction
Improve Restroom Facilities to Eliminate Contamination Issues
  • Project Number: 139125
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Yellowstone
  • State: WY
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Install a wind turbine at a BLM-owned facility to reduce energy costs.
  • Project Number: LACAP0050000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd03000 - Rawlins Field Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Construction
Install solar panels at the Pinedale Field Office's shop building in order to reduce energy costs.
  • Project Number: LACAP0160000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd01000 - Pinedale Field Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Construction
Install solar power to the Cody Interagency Dispatch Center to reduce energy costs.
  • Project Number: LACAP0260000
  • Bureau: Bureau of Land Management
  • Unit: Llwyr00000 - Wind River/Bighorn Basin District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Construction
Install solar power to the Worland Field Office to reduce energy costs.
  • Project Number: LACAP0310000
  • Bureau: Bureau of Land Management
  • Unit: Llwyr00000 - Wind River/Bighorn Basin District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Construction
Installation of 25 solar lighting packages at recreation sites statewide
  • Project Number: LACAP0150000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Construction
Jack Morrow Hills Big Game Habitat Monitoring and Mapping
  • Project Number: LXUAA0420000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd04000 - Rock Springs Field Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Renewable Energy - Facilitating Authorizations and Permits
Kemmerer Field Office deferred maintenance
  • Project Number: LDDFR0170000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Deferred Maintenance
Lands Status Renewable Energy Information Updates to Facilitate Public and Industry Applications
  • Project Number: LXUAA1410000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Renewable Energy - Facilitating Authorizations and Permits
National Historic Trail Interpretive Site Maintenance/upgrade and trail marking
  • Project Number: LDTDF0800000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Trails Maintenance and Construction
National Historic Trail inventory, context development and landscape analysis pertaining to Wind Dev
  • Project Number: LXUAA0390000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Renewable Energy - Facilitating Authorizations and Permits
Operation and Maintenance Repairs for Tribal Spt Operations Detention Center and Employee Housing
  • Project Number: Y1C20
  • TAFS: 149/02101
  • Bureau: Indian Affairs
  • Unit: Multi Locations
  • State: WY
  • Congressional District: 00
  • Type of Project: On-the-Job Training (Construction)
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 4/27/2010
Paint Exterior of Historic Buildings
  • Project Number: 151280
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Devils Tower
  • State: WY
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Paint, Plaster, and Repair Floor Coverings in Historic Structures and Ruins (multiple projects)
  • Project Number: 154835
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Fort Laramie
  • State: WY
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Powerplant Life Safety - Modifications to powerplants to meet current Life Safety Code (NFPA 101) requirements - Boysen Powerplant - Installation of illuminated Exit signs on each level at each egress; Enclose stairwells and install fire rated doors; Seal penetrations in egress; Installation of audio and video notification type fire alarm devices; Installation of smoke detection devices, notification panels, and pull stations.
  • Project Number: 37
  • TAFS: 14-0681
  • Bureau: Bureau of Reclamation
  • Unit: Boysen Unit, Pick-Sloan Missouri Basin Program (P-S MBP)
  • State: WY
  • Congressional District: 1
  • Type of Project: Water Infrastructure Reliability and Safety
Powerplant Life Safety - Modifications to powerplants to meet current Life Safety Code (NFPA 101) requirements in several areas. Guernsey Powerplant- Installation of audio and video notification type fire alarm devices; Installation of smoke detection devices, notification panels, and pull stations; Installation of illuminated Exit signs on each level at each egress.
  • Project Number: 34
  • TAFS: 14-0681
  • Bureau: Bureau of Reclamation
  • Unit: North Platte Project
  • State: WY
  • Congressional District: 1
  • Type of Project: Water Infrastructure Reliability and Safety
Powerplant Life Safety - Modifications to powerplants to meet current Life Safety Code (NFPA 101) requirements in several areas. Heart Mountain Powerplant -Installation of a second means of egress; Installation of illuminated Exit signs on each level at each egress; Installation of audio and video notification type fire alarm devices; Installation of smoke detection devices, notification panels, and pull stations.
  • Project Number: 35
  • TAFS: 14-0681
  • Bureau: Bureau of Reclamation
  • Unit: Shoshone Project
  • State: WY
  • Congressional District: 1
  • Type of Project: Water Infrastructure Reliability and Safety
Powerplant Life Safety - Modifications to powerplants to meet current Life Safety Code (NFPA 101) requirements. Alcova and Seminoe Powerplant - includes installation of 2-hour fire-rated doors, stairwell enclosure, fire-rated materials to seal all penetrations in the egress routes, louvers with fusible links in the battery room, fire alarm and smoke detection devices, notification panels, and pull stations and isolation of ventilation duct.
  • Project Number: 36
  • TAFS: 14-0681
  • Bureau: Bureau of Reclamation
  • Unit: Kendrick Project
  • State: WY
  • Congressional District: 1
  • Type of Project: Water Infrastructure Reliability and Safety
Powerplant Life Safety - Modifications to powerplants to meet current Life Safety Code (NFPA 101) requirements. Buffalo Bill, Spirit Mountain, and Shoshone Powerplants - includes installation of 2-hour fire-rated doors, stairwell enclosure, fire-rated materials to seal all penetrations in the egress routes, louvers with fusible links in the battery room, fire alarm and smoke detection devices, notification panels, and pull stations and isolation of ventilation duct.
  • Project Number: 40
  • TAFS: 14-0681
  • Bureau: Bureau of Reclamation
  • Unit: Buffalo Bill Dam Mod, P-S MBP
  • State: WY
  • Congressional District: 1
  • Type of Project: Water Infrastructure Reliability and Safety
Powerplant Life Safety - Modifications to powerplants to meet current Life Safety Code (NFPA 101) requirements. Kortes, Glendo, and Fremont Canyon Powerplants - includes installation of 2-hour fire-rated doors, stairwell enclosure, fire-rated materials to seal all penetrations in the egress routes, louvers with fusible links in the battery room, fire alarm and smoke detection devices, notification panels, and pull stations and isolation of ventilation duct.
  • Project Number: 38
  • TAFS: 14-0681
  • Bureau: Bureau of Reclamation
  • Unit: North Platte Area, P-S MBP
  • State: WY
  • Congressional District: 1
  • Type of Project: Water Infrastructure Reliability and Safety
Powerplant Units 1 & 2 Rewind
  • Project Number: 104.506
  • TAFS: 14-0681
  • Bureau: Bureau of Reclamation
  • Unit: Boysen Unit, P-S MBP
  • State: WY
  • Congressional District: 1
  • Type of Project: Water Infrastructure Reliability and Safety
Rawlins Visual Resource Management Inventory
  • Project Number: LXUAA0370000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Renewable Energy - Facilitating Authorizations and Permits
Realign Segments of the Historic Shelf Lake Trail
  • Project Number: 8438
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Yellowstone
  • State: WY
  • Type of Project: Trails Maintenance and Construction
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Rebuild one mile of sub-grade and final grade through a poorly drained section of road
  • Project Number: LDRBC0290000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Roads and Bridges Maintenance
Rehab Water Management Stuctures
  • Project Number: R6GN
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Cokeville Meadows NWR
  • State: WY
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Rehabilitate and Repave Historic South Rim Drive
  • Project Number: 20115
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Yellowstone
  • State: WY
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Rehabilitate Historic Lower Granite Canyon Trail
  • Project Number: 111825
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Grand Teton
  • State: WY
  • Type of Project: Trails Maintenance and Construction
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Rehabilitate Moose Maintenance Building, Phases 1, 2, & 3
  • Project Number: 83219
  • TAFS: (14-1041 2009 2010) Construction and Major Maintenance - Recovery Act
  • Bureau: National Park Service
  • Unit: Grand Teton
  • State: WY
  • Type of Project: Construction
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Rehabilitate the Historic Observation Peak Trail
  • Project Number: 8555
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Yellowstone
  • State: WY
  • Type of Project: Trails Maintenance and Construction
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Removal of Discontinued Cableway Station 2
  • Project Number: N/A
  • Bureau: U.S. Geological Survey
  • Unit: N/A
  • State: WY
  • Congressional District: 1
  • Type of Project: Deferred Maintenance - Discontinued Streamgages, Cableways, Wells
Removal of Discontinued Cableway Station 3
  • Project Number: N/A
  • Bureau: U.S. Geological Survey
  • Unit: N/A
  • State: WY
  • Congressional District: 1
  • Type of Project: Deferred Maintenance - Discontinued Streamgages, Cableways, Wells
Removal of Discontinued Cableway Station 5
  • Project Number: N/A
  • Bureau: U.S. Geological Survey
  • Unit: N/A
  • State: WY
  • Congressional District: 1
  • Type of Project: Deferred Maintenance - Discontinued Streamgages, Cableways, Wells
Removal of Discontinued Streamgage 7
  • Project Number: N/A
  • Bureau: U.S. Geological Survey
  • Unit: N/A
  • State: WY
  • Congressional District: 1
  • Type of Project: Deferred Maintenance - Discontinued Streamgages, Cableways, Wells
Removal of Discontinued Streamgage 9
  • Project Number: N/A
  • Bureau: U.S. Geological Survey
  • Unit: N/A
  • State: WY
  • Congressional District: 1
  • Type of Project: Deferred Maintenance - Discontinued Streamgages, Cableways, Wells
Remove rock outcrops sections on Bureau of Land Management roads in the Worland Field Office area.
  • Project Number: LDRBC0300000
  • Bureau: Bureau of Land Management
  • Unit: Llwyr00000 - Wind River/Bighorn Basin District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Roads and Bridges Maintenance
Renewable Energy Case Records Verification and Updates to Provide Application Status
  • Project Number: LXUAA1510000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Renewable Energy - Facilitating Authorizations and Permits
Repair Boardwalks near Thermal Features
  • Project Number: 121570
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Yellowstone
  • State: WY
  • Type of Project: Trails Maintenance and Construction
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Repair Deteriorating Trails and Footbridges
  • Project Number: 121640
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Yellowstone
  • State: WY
  • Type of Project: Trails Maintenance and Construction
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Repair Hazardous Propane Service Line at Fort Yellowstone
  • Project Number: 136197
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Yellowstone
  • State: WY
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Repair the 5-Springs Road - install guard rails and drainage structures on the access road
  • Project Number: LDRBC0310000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Roads and Bridges Maintenance
Repair Walks and Patios at Visitor Center
  • Project Number: 142076
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Fossil Butte
  • State: WY
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Replace 2 Residences and 1 Bunkhouse-mice infested
  • Project Number: R6JG
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Seedskadee NWR
  • State: WY
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Replace and repair culverts, Gabion, water crossings on WY BLM roads
  • Project Number: LDRBC0320000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Roads and Bridges Maintenance
Replace Deteriorated Hatchery Spring Water Supply Line [p/d/cc]
  • Project Number: R6PH
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Saratoga NFH
  • State: WY
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Replace Deteriorated Visitor Center Exhibits
  • Project Number: R6BG
  • TAFS: 14-1613
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: National Elk Refuge
  • State: WY
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Replace Deteriorating Spring and Reservoir to Ensure Clean Drinking Water
  • Project Number: 20128
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Yellowstone
  • State: WY
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Replace Failing Steam Heat for Historic Buildings Used By Public
  • Project Number: 144690
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Yellowstone
  • State: WY
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Replace Leaking Underground Fuel Storage Tanks and Remediate Soil Contamination
  • Project Number: 149861
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Yellowstone
  • State: WY
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Replace or repair bridges in poor structural condition to improve public safety
  • Project Number: LDRBC0330000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Roads and Bridges Maintenance
Replace Residence #5
  • Project Number: R6BK
  • TAFS: 14-1613
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Seedskadee NWR
  • State: WY
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Replace the chilling unit as part of an on-going contract to repair the aging heating and ventilatio
  • Project Number: LDDFR0980000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Deferred Maintenance
Resurface South Entrance Roadway
  • Project Number: 121359
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Yellowstone
  • State: WY
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Road Maintenance Project
  • Project Number: C582802H
  • TAFS: 149/02302
  • Bureau: Indian Affairs
  • Unit: WIND RIVER
  • State: WY
  • Congressional District: 01
  • Type of Project: Road-Bridge Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 4/27/2010
Rock Springs Field Office - Reshape and repair drainage
  • Project Number: LDDFR1210000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Deferred Maintenance
Rock Springs Field Office Solar Electric and Water Heat
  • Project Number: LACAP0220000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd04000 - Rock Springs Field Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Construction
Rock Springs Office - replace sidewalk
  • Project Number: LDDFR0990000
  • Bureau: Bureau of Land Management
  • Unit: Llwyr01000 - Worland Field Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Deferred Maintenance
Rock Waterhole Detention Dam - Repair holes in dike
  • Project Number: LDDFR0790000
  • Bureau: Bureau of Land Management
  • Unit: Llwyr00000 - Wind River/Bighorn Basin District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Deferred Maintenance
Sand Dunes Rec. Site Gravel
  • Project Number: LDRBC0340000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Roads and Bridges Maintenance
SCAB Creek Campground Health and Safety Remediation
  • Project Number: LACAP0630000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Construction
Scab Creek Road Gravel
  • Project Number: LDRBC0360000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Roads and Bridges Maintenance
Trail restoration of 100 miles of OHV intrusions in WSAs
  • Project Number: LDTDF0760000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Trails Maintenance and Construction
Upgrade 8 miles of non-motorized single/two track trail within the Warren Bridge Public Access Area
  • Project Number: LDTDF0790000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Trails Maintenance and Construction
Upgrade USGS Streamgages through purchase of High Data Rate Satellite Radios and new technology
  • Project Number: N/A
  • Bureau: U.S. Geological Survey
  • Unit: N/A
  • State: WY
  • Congressional District: 1
  • Type of Project: Upgrade Streamgages
Upper Green Road Gravel
  • Project Number: LDRBC0370000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Roads and Bridges Maintenance
Utilize solar energy to power submersible pump at the Scab Creek Campground
  • Project Number: LACAP0060000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd01000 - Pinedale Field Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Construction
Water Distribution System - Eastside - Construction of a distribution system to supply eastside campgrounds as well as park headquarters, which includes staff residences.
  • Project Number: 81
  • TAFS: 14-0681
  • Bureau: Bureau of Reclamation
  • Unit: Keyhole Unit, P-S MBP
  • State: WY
  • Congressional District: 1
  • Type of Project: Water Infrastructure Reliability and Safety
White Mountain Petroglyphs Road Gravel
  • Project Number: LDRBC0380000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Roads and Bridges Maintenance
Wild Horse Holding Facility Waterline Reclamation and Seeding
  • Project Number: LDDFR0500000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Deferred Maintenance
Worland Field Office repair parking lot and security fence
  • Project Number: LDDFR0180000
  • Bureau: Bureau of Land Management
  • Unit: Llwyd00000 - Wyoming High Desert District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Deferred Maintenance
Wyoming Abandoned Mine site reclamation-Secure and seal hazardous mine openings in WY
  • Project Number: LXABH0780000
  • Bureau: Bureau of Land Management
  • Unit: Llwyr00000 - Wind River/Bighorn Basin District Office
  • State: WY
  • Congressional District: 1
  • Type of Project: Remediation of Abandoned Mines


DOI Recovery Investments by Bureau

Last Updated: February 02, 2012
Content contact: recovery@ios.doi.gov