Secretary of the Interior Ken Salazar announced the Department of the Interior’s projects under the American Recovery and Reinvestment Act of 2009 for Texas. Across its Bureaus, the Department will invest in Texas as part of the recovery plan signed by the President to jumpstart our economy, create or save millions of jobs, and put a down payment on addressing long-neglected challenges so our country can thrive in the 21st Century.

Funding Overview

Texas: $30,789,608

Bureau of Reclamation: $1,228,575    BOR Logo

  • Title XVI - Water Reclamation and Reuse: $1,228,575

Indian Affairs: $187,033    BIA Logo

National Park Service: $12,401,000    NPS Logo

  • Alibates Flint Quarries: $69,000
  • Amistad: $208,000
  • Big Bend: $10,468,000
  • Big Thicket: $667,000
  • Chamizal: $78,000
  • Fort Davis: $46,000
  • Guadalupe Mountains: $309,000
  • Lake Meredith: $53,000
  • Lyndon B. Johnson: $175,000
  • Padre Island: $155,000
  • Palo Alto Battlefield: $70,000
  • San Antonio Missions: $103,000

U.S. Fish and Wildlife Service: $16,004,000    FWS Logo

  • Anahuac NWR: $29,000
  • Aransas NWR : $346,000
  • Brazoria NWR: $567,000
  • Buffalo Lake NWR: $250,000
  • Hagerman NWR: $3,214,000
  • Inks Dam NFH: $560,000
  • Laguna Atascosa NWR: $2,315,000
  • Lower Rio Grande Valley NWR: $695,000
  • McFaddin NWR: $0
  • San Bernard NWR: $29,000
  • San Marcos NFHTC: $451,000
  • Texas Chenier Plain Refuge Complex: $6,400,000
  • Texas Mid-Coast Refuges Complex: $250,000
  • TX : $100,000
  • Upper Texas Coast Coastal Program: $455,000
  • Uvalde NFH: $343,000

U.S. Geological Survey: $969,000    USGS Logo

Projects in Texas

Sort by:

Add office/storage space and three bays onto the existing Greenhouse used for Texas wild rice recovery
  • Project Number: R2RA
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: San Marcos NFHTC
  • State: TX
  • Congressional District: 25
  • Type of Project: Construction
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
City of Round Rock, Williamson County, TX—City of Round Rock Reuse Project
  • Project Number: 1.129
  • TAFS: 14-0681
  • Bureau: Bureau of Reclamation
  • Unit: City of Round Rock, Williamson County, TX
  • State: TX
  • Congressional District: 31
  • Type of Project: Title XVI - Water Reclamation and Reuse
Construct a Chain Link Fence around Holding House
  • Project Number: R2PZ
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: San Marcos NFHTC
  • State: TX
  • Congressional District: 25
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Construct a flume in Garmon Slough at east fence line
  • Project Number: R2QJ
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Uvalde NFH
  • State: TX
  • Congressional District: 23
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Construct a new chemical storage building and a shed over the CAT LPG emergency generator
  • Project Number: R2QF
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Uvalde NFH
  • State: TX
  • Congressional District: 23
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Construct a New Septic System at Residence 2
  • Project Number: R2QK
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Uvalde NFH
  • State: TX
  • Congressional District: 23
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Construct a New Water Supply Pipeline for Ponds 12-16 & 21-25
  • Project Number: R2QN
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Uvalde NFH
  • State: TX
  • Congressional District: 24
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Construct Bird Deterrent Netting on Pond 30
  • Project Number: R2QH
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Uvalde NFH
  • State: TX
  • Congressional District: 23
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Construct New Administrative Facility
  • Project Number: R2AA
  • TAFS: 14-1613
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Brazoria NWR
  • State: TX
  • Congressional District: 14
  • Type of Project: Construction
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Construct retaining walls at Kettle 5B
  • Project Number: R2RF
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Inks Dam NFH
  • State: TX
  • Congressional District: 21
  • Type of Project: Deferred Maintenance
  • Project Status: Additional project that will be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Continue restoration of Bahia Grande Wetland Unit. Construct two 80 to 85-foot long, one-lane vehicle bridges to span marine tidal channels; construct low water crossings for overflow during tidal surges or high water periods.
  • Project Number: R2MD
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Laguna Atascosa NWR
  • State: TX
  • Congressional District: 27
  • Type of Project: Habitat Restoration
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Demolish and Replace Comfort Station to Meet ADA Requirements
  • Project Number: 132945
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Alibates Flint Quarries
  • State: TX
  • Congressional District: 13
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Demolish and Replace Light Towers
  • Project Number: 89917
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Chamizal
  • State: TX
  • Congressional District: 16
  • Type of Project: Deferred Maintenance
  • Project Status: Additional project that will be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Energy Efficiency - replace lights; increase insulation; install programmable thermostats; caulk, seal, and weatherstrip leaks; replace windows; and replace appliances.
  • Project Number: R2QM
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Uvalde NFH
  • State: TX
  • Congressional District: 23
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Energy Efficiency - replace lights; increase insulation; install programmable thermostats; caulk, seal, and weatherstrip leaks; replace windows; and replace appliances.
  • Project Number: R2QA
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: San Marcos NFHTC
  • State: TX
  • Congressional District: 25
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Energy Efficiency - replace lights; increase insulation; install programmable thermostats; caulk, seal, and weatherstrip leaks; replace windows; and replace appliances.
  • Project Number: R2PP
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Inks Dam NFH
  • State: TX
  • Congressional District: 21
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Improve Visitor Safety by Rehabilitating Trails Parkwide
  • Project Number: 118660
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Big Bend
  • State: TX
  • Congressional District: 12
  • Type of Project: Trails Maintenance and Construction
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Indian Point Saltmarsh Restoration Nueces County, Texas
  • Project Number: R2FA
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Upper Texas Coast Coastal Program
  • State: TX
  • Congressional District: 27
  • Type of Project: Habitat Restoration
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Install Bollards to Prevent Erosion at Bird Island Basin Campground
  • Project Number: 149203
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Padre Island
  • State: TX
  • Congressional District: 27
  • Type of Project: Deferred Maintenance
  • Project Status: Additional project that will be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Install emergency electrical system for Wilson Well (for T&E species)
  • Project Number: R2QL
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Uvalde NFH
  • State: TX
  • Congressional District: 23
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Install Influent Filtration System to Prevent Unwanted Species from Entering Hatchery
  • Project Number: R2PN
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Inks Dam NFH
  • State: TX
  • Congressional District: 21
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
NFPP: Red Fish Landing AB-SR-1 Culvert Restoration Project
  • Project Number: R2TA
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Aransas NWR
  • State: TX
  • Congressional District: 14
  • Type of Project: Habitat Restoration
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Perform Preservation Treatment on 123 Miles of Roads Parkwide
  • Project Number: 144756
  • TAFS: (14-1041 2009 2010) Construction and Major Maintenance - Recovery Act
  • Bureau: National Park Service
  • Unit: Big Bend
  • State: TX
  • Congressional District: 23
  • Type of Project: Roads and Bridges Maintenance
  • Project Status: Additional project that will be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Provide an adequate base of operations for staff and volunteers, and an orientation point for visitors by constructing an energy efficient Headquarters/Visitor Building using a standard floor plan design to gain cost efficiencies
  • Project Number: R2AK
  • TAFS: 14-1613
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Texas Chenier Plain Refuge Complex
  • State: TX
  • Congressional District: 9
  • Type of Project: Construction
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Rebuild 6.1 Miles of Ranch Fencing Along Tour Route to Maintain Historic Appearance
  • Project Number: 63372
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Lyndon B. Johnson
  • State: TX
  • Congressional District: 11
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Rehabilitate 0.6 miles of degraded existing service-use dirt road on the Arroyo los Negros tract.
  • Project Number: R2GL
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Lower Rio Grande Valley NWR
  • State: TX
  • Congressional District: 15
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Rehabilitate 5.76 miles of 1 lane Unit 8 County Road.
  • Project Number: R2BA
  • TAFS: 14-1613
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Laguna Atascosa NWR
  • State: TX
  • Congressional District: 27
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Rehabilitate deteriorated boat launch at the north end of Clam Lake.
  • Project Number: R2GV
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: McFaddin NWR
  • State: TX
  • Congressional District: 9
  • Type of Project: Deferred Maintenance
  • Project Status: Project cannot be completed within the timeframes of the Recovery Act, but remains a priority and may be completed with other funds in the future
  • Project Status Updated: 02/17/10
Rehabilitate foot trails on Salineno and Arroyo Los Negros tract.
  • Project Number: R2GK
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Lower Rio Grande Valley NWR
  • State: TX
  • Congressional District: 15
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Rehabilitate Historic Law Enforcement Quarters
  • Project Number: 145942
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Big Bend
  • State: TX
  • Congressional District: 23
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Rehabilitate McCarty Well Pump House
  • Project Number: R2PX
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: San Marcos NFHTC
  • State: TX
  • Congressional District: 25
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Rehabilitate Office/Lab Building with new air handling unit, replace borken windows and reseal to prevent leaks during rain
  • Project Number: R2PW
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: San Marcos NFHTC
  • State: TX
  • Congressional District: 25
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Rehabilitate overgrown, silted-in boat canals in the White Unit.
  • Project Number: R2GU
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: McFaddin NWR
  • State: TX
  • Congressional District: 9
  • Type of Project: Deferred Maintenance
  • Project Status: Project cannot be completed within the timeframes of the Recovery Act, but remains a priority and may be completed with other funds in the future
  • Project Status Updated: 02/17/10
Rehabilitate Pine Springs Quarters (multiple projects)
  • Project Number: 154790
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Guadalupe Mountains
  • State: TX
  • Congressional District: 23
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Rehabilitate ponds 11, 12 and 16--split pond, build levee and kettle
  • Project Number: R2PM
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Inks Dam NFH
  • State: TX
  • Congressional District: 21
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Rehabilitate Sewer, Septic and Potable Water System at Historic Mission Espada
  • Project Number: 77026
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: San Antonio Missions
  • State: TX
  • Congressional District: 28
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Rehabilitate shop/garage building to bring electrical system to code and increase energy efficiency
  • Project Number: R2PY
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: San Marcos NFHTC
  • State: TX
  • Congressional District: 25
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Rehabilitate the deteriorated and damaged surface of the Sergeant Entrance road.
  • Project Number: R2GX
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: San Bernard NWR
  • State: TX
  • Congressional District: 14
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Rehabilitate two 40-foot long concrete walls.
  • Project Number: R2GN
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Lower Rio Grande Valley NWR
  • State: TX
  • Congressional District: 15
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Rehabilitate Volunteer-In Parks Camping Area
  • Project Number: 146872
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Padre Island
  • State: TX
  • Congressional District: 27
  • Type of Project: Deferred Maintenance
  • Project Status: Additional project that will be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Rehabilitate worn Middleton Levee hunter access trail.
  • Project Number: R2GT
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: McFaddin NWR
  • State: TX
  • Congressional District: 9
  • Type of Project: Deferred Maintenance
  • Project Status: Project cannot be completed within the timeframes of the Recovery Act, but remains a priority and may be completed with other funds in the future
  • Project Status Updated: 02/17/10
Removal of Discontinued Streamgage 1
  • Project Number: N/A
  • Bureau: U.S. Geological Survey
  • Unit: N/A
  • State: TX
  • Congressional District: 99
  • Type of Project: Deferred Maintenance - Discontinued Streamgages, Cableways, Wells
Removal of Discontinued Streamgage 6
  • Project Number: N/A
  • Bureau: U.S. Geological Survey
  • Unit: N/A
  • State: TX
  • Congressional District: 99
  • Type of Project: Deferred Maintenance - Discontinued Streamgages, Cableways, Wells
Remove abandon infrastructure from West oil field.
  • Project Number: R2GQ
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: McFaddin NWR
  • State: TX
  • Congressional District: 9
  • Type of Project: Deferred Maintenance
  • Project Status: Project cannot be completed within the timeframes of the Recovery Act, but remains a priority and may be completed with other funds in the future
  • Project Status Updated: 02/17/10
Remove and Replace Unserviceable Air Handling Units to Improve Energy Efficiency
  • Project Number: 153525
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Palo Alto Battlefield
  • State: TX
  • Congressional District: 27
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Remove Hurricane Ike Debris
  • Project Number: 149130
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Padre Island
  • State: TX
  • Congressional District: 27
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Remove Trash and Debris Along the Shoreline
  • Project Number: 151517
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Amistad
  • State: TX
  • Congressional District: 23
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Remove Two Oil and Gas Wells and Restore Natural Landscape
  • Project Number: 148162
  • TAFS: (14-1041 2009 2010) Construction and Major Maintenance - Recovery Act
  • Bureau: National Park Service
  • Unit: Big Thicket
  • State: TX
  • Congressional District: 8
  • Type of Project: Remediation of Abandoned Mines
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Renewable Energy - Solar Photovoltaic projects on buildings
  • Project Number: R2CG
  • TAFS: 14-1613
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Aransas NWR
  • State: TX
  • Congressional District: 14
  • Type of Project: Energy Efficiency Retrofits
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Renewable Energy - Solar Photovoltaic projects on buildings
  • Project Number: R2CF
  • TAFS: 14-1613
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Laguna Atascosa NWR
  • State: TX
  • Congressional District: 27
  • Type of Project: Energy Efficiency Retrofits
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Renewable Energy - Solar Photovoltaic projects on buildings
  • Project Number: R2CC
  • TAFS: 14-1613
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Buffalo Lake NWR
  • State: TX
  • Congressional District: 13
  • Type of Project: Energy Efficiency Retrofits
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Renewable Energy - Solar Photovoltaic projects on buildings
  • Project Number: R2CB
  • TAFS: 14-1613
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Texas Mid-Coast Refuges Complex
  • State: TX
  • Congressional District: 14
  • Type of Project: Energy Efficiency Retrofits
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Repair deteriorated boat launch and associated dock at refuge headquarters.
  • Project Number: R2GR
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: McFaddin NWR
  • State: TX
  • Congressional District: 9
  • Type of Project: Deferred Maintenance
  • Project Status: Project cannot be completed within the timeframes of the Recovery Act, but remains a priority and may be completed with other funds in the future
  • Project Status Updated: 02/17/10
Repair Historic Guard and Retaining Walls
  • Project Number: 148660
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Big Bend
  • State: TX
  • Congressional District: 23
  • Type of Project: Deferred Maintenance
  • Project Status: Additional project that will be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Repair Hurricane Damage at Kirby Nature Trail Area
  • Project Number: 151777
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Big Thicket
  • State: TX
  • Congressional District: 99
  • Type of Project: Trails Maintenance and Construction
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Repair or replace boat rollers on the Middleton Tract.
  • Project Number: R2GA
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Anahuac NWR
  • State: TX
  • Congressional District: 9
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Repair Park Infrastructure Damaged by Flood
  • Project Number: 147132
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Big Bend
  • State: TX
  • Congressional District: 23
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Repair pond and dam, rebuild the spillway, and replace the drop pipe.
  • Project Number: R2GE
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Hagerman NWR
  • State: TX
  • Congressional District: 4
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Repair raceways waste water drain line
  • Project Number: R2RD
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: San Marcos NFHTC
  • State: TX
  • Congressional District: 25
  • Type of Project: Deferred Maintenance
  • Project Status: Additional project that will be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Repair Trails Parkwide
  • Project Number: 142896
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Guadalupe Mountains
  • State: TX
  • Congressional District: 23
  • Type of Project: Trails Maintenance and Construction
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Replace 900' of 8" Transit drain line and install valves
  • Project Number: R2QZ
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Inks Dam NFH
  • State: TX
  • Congressional District: 21
  • Type of Project: Deferred Maintenance
  • Project Status: Additional project that will be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Replace a condemned building with an energy efficient Headquarters/Visitor Building using a standard floor plan design to gain cost efficiencies
  • Project Number: R2GD
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Hagerman NWR
  • State: TX
  • Congressional District: 4
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Replace barbed wire boundary fence and 4 gates.
  • Project Number: R2GM
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Lower Rio Grande Valley NWR
  • State: TX
  • Congressional District: 15
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Replace dilapidated 4-strand barbed wire boundary fence
  • Project Number: R2GP
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Lower Rio Grande Valley NWR
  • State: TX
  • Congressional District: 15
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Replace Fixtures at Three Comfort Stations With Water-Saving Models (multiple projects)
  • Project Number: 154922
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Lake Meredith
  • State: TX
  • Congressional District: 13
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Replace Heating System Boiler at Park Headquarters/Visitor Center
  • Project Number: 89819
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Guadalupe Mountains
  • State: TX
  • Congressional District: 23
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Replace HVAC System at Historic Texas Whitehouse
  • Project Number: 143482
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Lyndon B. Johnson
  • State: TX
  • Congressional District: 28
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Replace HVAC System in Ranger Station
  • Project Number: 134787
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Lake Meredith
  • State: TX
  • Congressional District: 13
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Replace Kettle 4 & build retaining walls
  • Project Number: R2RC
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Inks Dam NFH
  • State: TX
  • Congressional District: 21
  • Type of Project: Deferred Maintenance
  • Project Status: Additional project that will be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Replace Kettle N4 & build retaining walls
  • Project Number: R2RB
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Inks Dam NFH
  • State: TX
  • Congressional District: 21
  • Type of Project: Deferred Maintenance
  • Project Status: Additional project that will be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Replace Kettle Screens
  • Project Number: R2QG
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Uvalde NFH
  • State: TX
  • Congressional District: 23
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Replace Refuge Boundary Signs
  • Project Number: R2GG
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Hagerman NWR
  • State: TX
  • Congressional District: 4
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Replace Roof on Visitor Contact Station and Maintenance Facility (multiple projects)
  • Project Number: 154920
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Lake Meredith
  • State: TX
  • Congressional District: 13
  • Type of Project: Deferred Maintenance
  • Project Status: Project was already completed with other funds
  • Project Status Updated: 03/03/10
Replace Sandy Point public observation tower.
  • Project Number: R2GF
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: Hagerman NWR
  • State: TX
  • Congressional District: 4
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Restore Coastal Prairie Ecosystems for Attwater's Prairie Chicken.
  • Project Number: R2ED
  • TAFS: 14-1610
  • Bureau: U.S. Fish and Wildlife Service
  • Unit: TX
  • State: TX
  • Congressional District: 99
  • Type of Project: Habitat Restoration
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 02/17/10
Restore Facilities Damaged by Hurricane Ike (multiple projects)
  • Project Number: 151786
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Big Thicket
  • State: TX
  • Congressional District: 8
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Road Maintenance Project
  • Project Number: M2072521
  • TAFS: 149/02302
  • Bureau: Indian Affairs
  • Unit: YSLETA DEL SUR
  • State: TX
  • Congressional District: 16
  • Type of Project: Road-Bridge Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 4/27/2010
Road Maintenance Project
  • Project Number: B0083020
  • TAFS: 149/02302
  • Bureau: Indian Affairs
  • Unit: ALABAMA-COUSHATTA TRIBE
  • State: TX
  • Congressional District: 02
  • Type of Project: Road-Bridge Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 4/27/2010
Road Maintenance Project
  • Project Number: B0082622
  • TAFS: 149/02302
  • Bureau: Indian Affairs
  • Unit: KICKAPOO TRADITIONAL TRIBE
  • State: TX
  • Congressional District: 23
  • Type of Project: Road-Bridge Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 4/27/2010
Stabilize Historic Brick Oven
  • Project Number: 153386
  • TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
  • Bureau: National Park Service
  • Unit: Fort Davis
  • State: TX
  • Congressional District: 23
  • Type of Project: Deferred Maintenance
  • Project Status: Project on track to be completed with Recovery Act funds
  • Project Status Updated: 03/03/10
Upgrade USGS Streamgages through purchase of High Data Rate Satellite Radios and new technology
  • Project Number: N/A
  • Bureau: U.S. Geological Survey
  • Unit: N/A
  • State: TX
  • Congressional District: 99
  • Type of Project: Upgrade Streamgages


DOI Recovery Investments by Bureau

Last Updated: February 02, 2012