Secretary of the Interior Ken Salazar announced the Department of the Interior’s projects under the American Recovery and Reinvestment Act of 2009 for Texas. Across its Bureaus, the Department will invest in Texas as part of the recovery plan signed by the President to jumpstart our economy, create or save millions of jobs, and put a down payment on addressing long-neglected challenges so our country can thrive in the 21st Century.
Funding Overview
Texas: $30,789,608
Bureau of Reclamation: $1,228,575 ![]()
- Title XVI - Water Reclamation and Reuse: $1,228,575
Indian Affairs: $187,033 ![]()
National Park Service: $12,401,000 ![]()
- Alibates Flint Quarries: $69,000
- Amistad: $208,000
- Big Bend: $10,468,000
- Big Thicket: $667,000
- Chamizal: $78,000
- Fort Davis: $46,000
- Guadalupe Mountains: $309,000
- Lake Meredith: $53,000
- Lyndon B. Johnson: $175,000
- Padre Island: $155,000
- Palo Alto Battlefield: $70,000
- San Antonio Missions: $103,000
U.S. Fish and Wildlife Service: $16,004,000 ![]()
- Anahuac NWR: $29,000
- Aransas NWR : $346,000
- Brazoria NWR: $567,000
- Buffalo Lake NWR: $250,000
- Hagerman NWR: $3,214,000
- Inks Dam NFH: $560,000
- Laguna Atascosa NWR: $2,315,000
- Lower Rio Grande Valley NWR: $695,000
- McFaddin NWR: $0
- San Bernard NWR: $29,000
- San Marcos NFHTC: $451,000
- Texas Chenier Plain Refuge Complex: $6,400,000
- Texas Mid-Coast Refuges Complex: $250,000
- TX : $100,000
- Upper Texas Coast Coastal Program: $455,000
- Uvalde NFH: $343,000
U.S. Geological Survey: $969,000 ![]()
- Deferred Maintenance - Discontinued Streamgages, Cableways, Wells: $154,000
- Upgrade Streamgages: $815,000
Projects in Texas
Add office/storage space and three bays onto the existing Greenhouse used for Texas wild rice recovery- Project Number: R2RA
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: San Marcos NFHTC
- State: TX
- Congressional District: 25
- Type of Project: Construction
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: 1.129
- TAFS: 14-0681
- Bureau: Bureau of Reclamation
- Unit: City of Round Rock, Williamson County, TX
- State: TX
- Congressional District: 31
- Type of Project: Title XVI - Water Reclamation and Reuse
- Project Number: R2PZ
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: San Marcos NFHTC
- State: TX
- Congressional District: 25
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2QJ
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Uvalde NFH
- State: TX
- Congressional District: 23
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2QF
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Uvalde NFH
- State: TX
- Congressional District: 23
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2QK
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Uvalde NFH
- State: TX
- Congressional District: 23
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2QN
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Uvalde NFH
- State: TX
- Congressional District: 24
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2QH
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Uvalde NFH
- State: TX
- Congressional District: 23
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2AA
- TAFS: 14-1613
- Bureau: U.S. Fish and Wildlife Service
- Unit: Brazoria NWR
- State: TX
- Congressional District: 14
- Type of Project: Construction
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2RF
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Inks Dam NFH
- State: TX
- Congressional District: 21
- Type of Project: Deferred Maintenance
- Project Status: Additional project that will be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2MD
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Laguna Atascosa NWR
- State: TX
- Congressional District: 27
- Type of Project: Habitat Restoration
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: 132945
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Alibates Flint Quarries
- State: TX
- Congressional District: 13
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: 89917
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Chamizal
- State: TX
- Congressional District: 16
- Type of Project: Deferred Maintenance
- Project Status: Additional project that will be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: R2QM
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Uvalde NFH
- State: TX
- Congressional District: 23
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2QA
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: San Marcos NFHTC
- State: TX
- Congressional District: 25
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2PP
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Inks Dam NFH
- State: TX
- Congressional District: 21
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: 118660
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Big Bend
- State: TX
- Congressional District: 12
- Type of Project: Trails Maintenance and Construction
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: R2FA
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Upper Texas Coast Coastal Program
- State: TX
- Congressional District: 27
- Type of Project: Habitat Restoration
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: 149203
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Padre Island
- State: TX
- Congressional District: 27
- Type of Project: Deferred Maintenance
- Project Status: Additional project that will be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: R2QL
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Uvalde NFH
- State: TX
- Congressional District: 23
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2PN
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Inks Dam NFH
- State: TX
- Congressional District: 21
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2TA
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Aransas NWR
- State: TX
- Congressional District: 14
- Type of Project: Habitat Restoration
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: 144756
- TAFS: (14-1041 2009 2010) Construction and Major Maintenance - Recovery Act
- Bureau: National Park Service
- Unit: Big Bend
- State: TX
- Congressional District: 23
- Type of Project: Roads and Bridges Maintenance
- Project Status: Additional project that will be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: R2AK
- TAFS: 14-1613
- Bureau: U.S. Fish and Wildlife Service
- Unit: Texas Chenier Plain Refuge Complex
- State: TX
- Congressional District: 9
- Type of Project: Construction
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: 63372
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Lyndon B. Johnson
- State: TX
- Congressional District: 11
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: R2GL
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Lower Rio Grande Valley NWR
- State: TX
- Congressional District: 15
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2BA
- TAFS: 14-1613
- Bureau: U.S. Fish and Wildlife Service
- Unit: Laguna Atascosa NWR
- State: TX
- Congressional District: 27
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2GV
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: McFaddin NWR
- State: TX
- Congressional District: 9
- Type of Project: Deferred Maintenance
- Project Status: Project cannot be completed within the timeframes of the Recovery Act, but remains a priority and may be completed with other funds in the future
- Project Status Updated: 02/17/10
- Project Number: R2GK
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Lower Rio Grande Valley NWR
- State: TX
- Congressional District: 15
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: 145942
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Big Bend
- State: TX
- Congressional District: 23
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: R2PX
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: San Marcos NFHTC
- State: TX
- Congressional District: 25
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2PW
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: San Marcos NFHTC
- State: TX
- Congressional District: 25
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2GU
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: McFaddin NWR
- State: TX
- Congressional District: 9
- Type of Project: Deferred Maintenance
- Project Status: Project cannot be completed within the timeframes of the Recovery Act, but remains a priority and may be completed with other funds in the future
- Project Status Updated: 02/17/10
- Project Number: 154790
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Guadalupe Mountains
- State: TX
- Congressional District: 23
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: R2PM
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Inks Dam NFH
- State: TX
- Congressional District: 21
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: 77026
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: San Antonio Missions
- State: TX
- Congressional District: 28
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: R2PY
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: San Marcos NFHTC
- State: TX
- Congressional District: 25
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2GX
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: San Bernard NWR
- State: TX
- Congressional District: 14
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2GN
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Lower Rio Grande Valley NWR
- State: TX
- Congressional District: 15
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: 146872
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Padre Island
- State: TX
- Congressional District: 27
- Type of Project: Deferred Maintenance
- Project Status: Additional project that will be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: R2GT
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: McFaddin NWR
- State: TX
- Congressional District: 9
- Type of Project: Deferred Maintenance
- Project Status: Project cannot be completed within the timeframes of the Recovery Act, but remains a priority and may be completed with other funds in the future
- Project Status Updated: 02/17/10
- Project Number: N/A
- Bureau: U.S. Geological Survey
- Unit: N/A
- State: TX
- Congressional District: 99
- Type of Project: Deferred Maintenance - Discontinued Streamgages, Cableways, Wells
- Project Number: N/A
- Bureau: U.S. Geological Survey
- Unit: N/A
- State: TX
- Congressional District: 99
- Type of Project: Deferred Maintenance - Discontinued Streamgages, Cableways, Wells
- Project Number: R2GQ
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: McFaddin NWR
- State: TX
- Congressional District: 9
- Type of Project: Deferred Maintenance
- Project Status: Project cannot be completed within the timeframes of the Recovery Act, but remains a priority and may be completed with other funds in the future
- Project Status Updated: 02/17/10
- Project Number: 153525
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Palo Alto Battlefield
- State: TX
- Congressional District: 27
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: 149130
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Padre Island
- State: TX
- Congressional District: 27
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: 151517
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Amistad
- State: TX
- Congressional District: 23
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: 148162
- TAFS: (14-1041 2009 2010) Construction and Major Maintenance - Recovery Act
- Bureau: National Park Service
- Unit: Big Thicket
- State: TX
- Congressional District: 8
- Type of Project: Remediation of Abandoned Mines
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: R2CG
- TAFS: 14-1613
- Bureau: U.S. Fish and Wildlife Service
- Unit: Aransas NWR
- State: TX
- Congressional District: 14
- Type of Project: Energy Efficiency Retrofits
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2CF
- TAFS: 14-1613
- Bureau: U.S. Fish and Wildlife Service
- Unit: Laguna Atascosa NWR
- State: TX
- Congressional District: 27
- Type of Project: Energy Efficiency Retrofits
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2CC
- TAFS: 14-1613
- Bureau: U.S. Fish and Wildlife Service
- Unit: Buffalo Lake NWR
- State: TX
- Congressional District: 13
- Type of Project: Energy Efficiency Retrofits
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2CB
- TAFS: 14-1613
- Bureau: U.S. Fish and Wildlife Service
- Unit: Texas Mid-Coast Refuges Complex
- State: TX
- Congressional District: 14
- Type of Project: Energy Efficiency Retrofits
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2GR
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: McFaddin NWR
- State: TX
- Congressional District: 9
- Type of Project: Deferred Maintenance
- Project Status: Project cannot be completed within the timeframes of the Recovery Act, but remains a priority and may be completed with other funds in the future
- Project Status Updated: 02/17/10
- Project Number: 148660
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Big Bend
- State: TX
- Congressional District: 23
- Type of Project: Deferred Maintenance
- Project Status: Additional project that will be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: 151777
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Big Thicket
- State: TX
- Congressional District: 99
- Type of Project: Trails Maintenance and Construction
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: R2GA
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Anahuac NWR
- State: TX
- Congressional District: 9
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: 147132
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Big Bend
- State: TX
- Congressional District: 23
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: R2GE
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Hagerman NWR
- State: TX
- Congressional District: 4
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2RD
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: San Marcos NFHTC
- State: TX
- Congressional District: 25
- Type of Project: Deferred Maintenance
- Project Status: Additional project that will be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: 142896
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Guadalupe Mountains
- State: TX
- Congressional District: 23
- Type of Project: Trails Maintenance and Construction
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: R2QZ
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Inks Dam NFH
- State: TX
- Congressional District: 21
- Type of Project: Deferred Maintenance
- Project Status: Additional project that will be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2GD
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Hagerman NWR
- State: TX
- Congressional District: 4
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2GM
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Lower Rio Grande Valley NWR
- State: TX
- Congressional District: 15
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2GP
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Lower Rio Grande Valley NWR
- State: TX
- Congressional District: 15
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: 154922
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Lake Meredith
- State: TX
- Congressional District: 13
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: 89819
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Guadalupe Mountains
- State: TX
- Congressional District: 23
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: 143482
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Lyndon B. Johnson
- State: TX
- Congressional District: 28
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: 134787
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Lake Meredith
- State: TX
- Congressional District: 13
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: R2RC
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Inks Dam NFH
- State: TX
- Congressional District: 21
- Type of Project: Deferred Maintenance
- Project Status: Additional project that will be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2RB
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Inks Dam NFH
- State: TX
- Congressional District: 21
- Type of Project: Deferred Maintenance
- Project Status: Additional project that will be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2QG
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Uvalde NFH
- State: TX
- Congressional District: 23
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2GG
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Hagerman NWR
- State: TX
- Congressional District: 4
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: 154920
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Lake Meredith
- State: TX
- Congressional District: 13
- Type of Project: Deferred Maintenance
- Project Status: Project was already completed with other funds
- Project Status Updated: 03/03/10
- Project Number: R2GF
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: Hagerman NWR
- State: TX
- Congressional District: 4
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: R2ED
- TAFS: 14-1610
- Bureau: U.S. Fish and Wildlife Service
- Unit: TX
- State: TX
- Congressional District: 99
- Type of Project: Habitat Restoration
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 02/17/10
- Project Number: 151786
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Big Thicket
- State: TX
- Congressional District: 8
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: M2072521
- TAFS: 149/02302
- Bureau: Indian Affairs
- Unit: YSLETA DEL SUR
- State: TX
- Congressional District: 16
- Type of Project: Road-Bridge Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 4/27/2010
- Project Number: B0083020
- TAFS: 149/02302
- Bureau: Indian Affairs
- Unit: ALABAMA-COUSHATTA TRIBE
- State: TX
- Congressional District: 02
- Type of Project: Road-Bridge Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 4/27/2010
- Project Number: B0082622
- TAFS: 149/02302
- Bureau: Indian Affairs
- Unit: KICKAPOO TRADITIONAL TRIBE
- State: TX
- Congressional District: 23
- Type of Project: Road-Bridge Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 4/27/2010
- Project Number: 153386
- TAFS: (14-1035 2009 2010) Operation of the National Park System - Recovery Act
- Bureau: National Park Service
- Unit: Fort Davis
- State: TX
- Congressional District: 23
- Type of Project: Deferred Maintenance
- Project Status: Project on track to be completed with Recovery Act funds
- Project Status Updated: 03/03/10
- Project Number: N/A
- Bureau: U.S. Geological Survey
- Unit: N/A
- State: TX
- Congressional District: 99
- Type of Project: Upgrade Streamgages
DOI Recovery Investments by Bureau
Select a bureau below to learn more about how each is contributing to America's economic recovery.
![]() |
![]() |
![]() |
![]() |
![]() |