Arizona State Office
- Black Rock Communications Site Repairs
- Hayden Peak Communications Site Safety and Security Improvements
- Perkins and Greenwood Peak Communications Site Safety and Security Repairs
- Land Status Renewable Energy Information
- Restoration Design Energy Project
Arizona Strip District Office
- Arizona Strip Field Office Trail Repairs
- Mojave Desert Initiative
- Nixon Spring Drinking Water Source Redevelopment
- Old Spanish National Historic Trail Condition Assessments
- Stateline Campground Project
- Virgin River Canyon Campground Solar Power Installation
Colorado District Office
- Burro Creek Campground Solar Power Installation
- Fire Mountain Mine Project
- Gigi Girl Mine Project
- Gold Hill Mine Project
- Great West Mine Project
- Imperial Dam Solar Power Improvements
- Kingman Field Office Trails Repairs
- Kingman Wild Horse & Burro Corrals
- La Posa LTVA Solar Power Installation
- Mary Nevada Mine Project
- Monolith Gardens Trailhead Turnoff Project
- Parker Strip Visitor Center Parking Lot Resurfacing
- Porter Mine Project
- San Diego Mine Project
- Swansea Mine
- Take-Off Point Solar Power Installation
- Thumb Butte Mine Project
- Times Gulch Mine Project
- Times Vein Mine Project
Gila District Office
- Arizona National Scenic Trail Repairs and Construction
- Boquillas Administrative Site Maintenance Building Construction
- Box Canyon Adit Closure
- Las Cienegas National Conservation Area Mesquite Stewardship Project
- San Pedro Riparian National Conservation Area Trail Reconstruction and Maintenance Project
- San Pedro Riparian National Conservation Area Trailhead Access Renovation Project
SKY ISLAND AND DESERT SEAS RESTORATION PHASE I
- Phase I Overview
- Gila Watershed Russian Knapweed Vegetation Treatment
- Goat Well Erosion-Control Structure
- Oso Largo Erosion-Control Structure
- Red Knolls Erosion-Control Structure
- San Simon Fence Construction and Reconstruction
SKY ISLAND AND DESERT SEAS RESTORATION PHASE II
- Aravaipa Uplands Erosion Control
- Gila Box RNCA Invasive Species Treatment
- Habitat Protection and Protection of Mexican Fee-tailed Bats
- Haekel Erosion Control
- Hot Well Habitat Improvement
- Posey Well Habitat Improvement
- Safford Field Office Vegetation Treatments
- Sands Draw Habitat Improvement
- Wildlife/Riparian Exclosure Repair and Maintenance
Phoenix District Office
- Bighorn Station
- Black Canyon National Recreation Trail Construction
- Hassayampa Field Office Trail Repairs
- Juan Baustista de Anza National Historic Trail Repairs
- Octave Mill Site Characterization
- Vulture Mine Backfill
- Wickenburg Mill Site Investigation
——————————————————-
- Abandoned Mine Lands Projects(15 projects)
- Capital Improvements (10 projects)
- Deferred Maintenance (6 projects)
- Habitat Restoration Projects (3 projects)
- Renewable Energy Projects(2 projects)
- Trails (9 projects)
- Hazardous Fuels (1 project)
Listing of all Arizona projects (Total: 46 projects, estimated cost $15.6 million)
Note:
Individual ARRA project allocations are not provided on this web site to allow proper competition and solicitation of bids for AZ ARRA projects. Category specific dollar amounts will be provided after project funds are obligated. In addition some projects may require more than one type of action or service to be completed. This could result in more than one contract being issued for a particular project or category in a few instances.







